Qublock Valves to Supply Petronas
Admin



Project: RGT-2 TERMINAL PROJECT

End User: PETRONAS Gas Berhad

Contractor : SAMSUNG-WHEESSOE-STS-SCTKL CONSORTIUM

Location: PENGERANG, JOHOR

Applications : Cryogenic Ball Valve for LNG Terminal (Require -196°C line condition)


Qublock Valves to Supply Petronas


As a Valve Specialist, Qublock has supplied a number of cryogenic ball valves for Regasification Terminal 2 Project (RGT2) operated by Petronas Gas Berhad who is subsidiary of the Malaysian national oil company, Petronas. The re-gasification terminal project is part of Malaysias development plan to secure stable natural gas supply for the nearby Refinery and Petrochemical Integrated Development (RAPID), Pengerang Co-generation Plant (PCP) and also to the Peninsular Gas Utilization (PGU) Grid. The plant will have a capacity of 3.5 mtpa and will be connected to Peninsular Gas Utilization (PGU) via the Pengerang Gas Pipeline (PGP) at the Pengerang Integrated Complex in Johor, Malaysia.


According to the PMRC MAR VA/115 regulation, QUBLOCK has supplied cryogenic ball valves for -196°C use which assured reliable cryogenic performance and guaranteed trouble-free production in customers process. Due to our professional team work with the customers, Qublock was able to provide the cryogenic valves within Six (6) weeks to on-site. Design, production and cryogenic test in house were smoothly carried out and finally met the required delivery schedule which was one of key points to complete the owners project on time.


Qublock care customer demand much and that is the reason the owner entrust us as the most reliable valve supplier with experience, know-how and references


Qublock promise continuing to serve our customers demand and requirement professionally.